Will the portal facilities for the Fehmarn Belt fixed link in Germany finish in 2025?
Basic
3
Ṁ272025
66%
chance
1D
1W
1M
ALL
According to the website:
5. Portal facilities
A portal building will be constructed around the descent into the tunnel on the Danish and German sides. The portal facilities will connect the tunnel railway and motorway with the upgraded and partly newly built roads and railways in the hinterland. The portal will contain a light grid in the tunnel roof to ensure a smooth transition between the natural light and the light in the tunnel.
Work on the portal buildings on the Danish and German sides began in 2022. They are expected to be finished in 2024 on the Danish side and 2025 for the German side.
This is only for the German side. For contrast, /marketwise/will-the-portal-facilities-for-the
This question is managed and resolved by Manifold.
Get
1,000
and3.00
Related questions
Related questions
Will the portal facilities for the Fehmarn Belt fixed link in Denmark finish in 2024?
72% chance
Will the first tunnel element for the Fehmarn Belt fixed link be immersed in 2024?
58% chance
Will the Fehmarn Belt fixed link between Denmark and Germany be completed by 2030?
47% chance
Will the Fehmarn Belt Tunnel open in 2029 or before?
33% chance
Will there be a nuclear powerplant operating in Germany, in 2024?
1% chance
Will there be a maximum speed on the German Autobahn at the end of 2025?
12% chance
Will construction on Penlink finish before 2027?
35% chance
Will a tunnel between Finland and Estonia have started construction by 2035?
55% chance
Will construction on Penlink finish before 2030?
45% chance
Will work on the "Messina Strait Bridge" begin in 2024?
1% chance