When will a bridge like the Francis Scott Key Bridge In Baltimore be accessible again?
➕
Plus
54
Ṁ12k
Dec 31
73%
Summer Solstice 2030
72%
Summer Solstice 2031
44%
Summer Solstice 2029
21%
Summer Solstice 2028
15%
Summer Solstice 2027
10%
Spring Equinox 2027
6%
Summer Solstice 2026
6%
Christmas 2025
5%
Summer Solstice 2025
1.4%
Christmas 2024
1.3%
Halloween 2024

When will the bridge either be repaired, or a new bridge constructed that a car can drive across in it's place?

Get
Ṁ1,000
and
S3.00
Sort by:

Fall of 2028 is the current MD plan

The original construction took almost 5 years from permitting (June 1972 - March 1977); it was already behind schedule and over budget when the permit was issued. Bids and approvals were 1970-1971. A couple options in the 2029-2031 range might make sense given that baseline, possibly along with one or more options for "even slower than the original".

@EvanDaniel That's a big timespan, there's some arguments for 'faster than the original', given that's it's now a big political will, but this could take awhile.

@Fedor Well the other argument that we need some longer time span options is simply that the longest dated one you have is still only trading at ~ 50%! Maybe just add another longer-dated option and see where it trades?

bought Ṁ10 Summer Solstice 2029 YES

@EvanDaniel Anyone can add answers, I just filled it out a little bit. Don't think we need more than 1/year granularity further out.

bought Ṁ20 Spring Equinox 2027 YES

What is the summer equinox?

@AndrewHebb Just me being a dumbass (I mean the summer solstice)

Marc Andreessen predicts never

Will every market after the repair/rebuild date resolve to Yes? Or just the closest one?

@AlexBeal Every markets after the repair/build. Those options would all have the bridge 'accessible again'

Related: