Will the third runway at Heathrow begin construction?
Standard
13
Ṁ4282030
39%
chance
1D
1W
1M
ALL
Heathrow has successfully obtained permission to build a third runway, and post COVID recovery means passenger numbers have returned to close to theoretical capacity so there is reason to build it.
However, funding for the runway is not in place, and a cost of £15 billion+ would need to be financed.
Will construction begin before 2030? Or will Heathrow go back to the drawing board and come up with a new plan that isn't building a runway in the position proposed (in which case this resolves NO)?
Get
1,000
and1.00
Related questions
Related questions
Will the UK HS2 rail line between London and Birmingham be operational before 2031?
27% chance
Will Crossrail 2 be approved before 2030?
35% chance
Will another Auckland Harbour crossing begin construction before 2040?
60% chance
Will a crossing of the Irish Sea, between Great Britain and Ireland, have started construction by 2035?
8% chance