Plans for a new nuclear power plant will be announced by an EU country in 2024.
Basic
9
Ṁ315
Jan 1
17%
chance

This will also resolve positively if a country announced plans for a new nuclear power plant and joined the EU, both within 2024.

Power plants must be commercial, i.e. connected to the grid. Experimental reactors not intended to produce net power do not count.

Get
Ṁ1,000
and
S3.00
Sort by:

Would new commercial reactors still considered in a somewhat experimental phase count? These are typically connected to the grid. Or is the criteria "Experimental reactors do not count" strictly excluding new reactors that won't be connected to the grid?

@Mattfr If the reactor is planned to be capable of feeding net power into the grid, it counts.

© Manifold Markets, Inc.Terms + Mana-only TermsPrivacyRules